Our Work
Crossings Delivered Across the Kingdom
Pipelines, tunnels, and shoring works completed for operators, authorities, and EPC contractors — each one measured, documented, and handed over on schedule.
0+
Projects Delivered
0+
Metres Installed
0
Sectors Served
Horizontal Directional Drilling4Micro-Tunnelling2Sheet Piling2

Horizontal Directional Drilling
Latest Delivery
Crude Oil Pipeline Crossing Beneath Highway 40
Oil & Gas OperatorEastern Province
A 620-metre carrier pipe installed beneath a live six-lane highway without a single lane closure.
- Diameter
- Ø900 mm
- Length
- 620 m
- Depth
- 6.2 m
- Duration
- 34 days
- Completed
- 2024
The Portfolio
Every Crossing on Record
Showing 7 of 7