Our Work

Crossings Delivered Across the Kingdom

Pipelines, tunnels, and shoring works completed for operators, authorities, and EPC contractors — each one measured, documented, and handed over on schedule.

0+
Projects Delivered
0+
Metres Installed
0
Sectors Served
Horizontal Directional Drilling4Micro-Tunnelling2Sheet Piling2
Horizontal Directional Drilling
Latest Delivery

Crude Oil Pipeline Crossing Beneath Highway 40

Oil & Gas OperatorEastern Province

A 620-metre carrier pipe installed beneath a live six-lane highway without a single lane closure.

Diameter
Ø900 mm
Length
620 m
Depth
6.2 m
Duration
34 days
Completed
2024
Read the case study