Horizontal Directional Drilling

Dammam Crude and Gas Development Project

HDD and installation of 12″ and 20″ steel pipelines with 4 × 4″ FOC ducts, over a total of 1,715 LM.

Project OwnerSaudi Aramco
12″ · 20″

Pipe

1,715 m

Length

Scope of Work

  • HDD and installation of 12″ and 20″ steel pipelines
  • HDD and installation of 4 × 4″ FOC ducts
  • Total length: 1,715 LM

Where the work was

Site
Dammam, Saudi Arabia
Project owner
Saudi Aramco
Total installed
1,715 m

The pin marks the field or corridor, not the exact crossing — the precise alignment is commercially sensitive.

Open in maps