Horizontal Directional Drilling
Dammam Crude and Gas Development Project
HDD and installation of 12″ and 20″ steel pipelines with 4 × 4″ FOC ducts, over a total of 1,715 LM.
Project OwnerSaudi Aramco
12″ · 20″
Pipe
1,715 m
Length
Scope of Work
- HDD and installation of 12″ and 20″ steel pipelines
- HDD and installation of 4 × 4″ FOC ducts
- Total length: 1,715 LM
Where the work was
- Site
- Dammam, Saudi Arabia
- Project owner
- Saudi Aramco
- Total installed
- 1,715 m
The pin marks the field or corridor, not the exact crossing — the precise alignment is commercially sensitive.