Horizontal Directional Drilling

Berri LTA-43 / Abu Ali Project

A 30″ carbon steel pipeline installed by HDD over 900 m, and a 40″ steel casing with 30″ product pipeline micro-tunnelled over 450 LM.

30″

HDD · Pipe

900 m

HDD · Length

40″ · 30″

Micro-Tunnelling · Pipe

450 m

Micro-Tunnelling · Length

Scope of Work

  • HDD of 30″ carbon steel (CS) pipeline — 900 m
  • Micro-tunnelling installation of 40″ steel casing and 30″ product pipeline — 450 LM

Where the work was

Site
Abu Ali Island, Jubail, Saudi Arabia
Total installed
1,350 m