
Maxi HDD Rig
Long crossings and large-diameter carrier pipe, where pullback force decides what is possible.
- Pullback
- 45 t
- Torque
- 18,000 Nm
- Max Bore
- Ø1,200 mm






Horizontal directional drilling, micro-tunnelling, and sheet piling for pipelines, utilities, and infrastructure — engineered for zero surface disruption.
Three core disciplines, one standard of precision.
Three commitments that shape every crossing we deliver.
Zero-compromise HSE culture — ISO 45001 certified, every crew trained before they touch a rig.
Remote-steered accuracy within millimetres, so pipelines and cables land exactly where the design says.
Realistic scheduling and disciplined execution — crossings completed on the date we commit to.
A sample of crossings completed across the Kingdom.
Owned outright, maintained in our own workshop, and operated by our own crews.

Long crossings and large-diameter carrier pipe, where pullback force decides what is possible.

Remotely steered tunnelling to precise line and grade, including below the water table.

Driving interlocking sheet piles where ground conditions allow vibratory installation.
Rigs, crews, and crossings across the Kingdom.






Trusted Across Industries
Every crew, every crossing — zero shortcuts on safety.
Lost-Time Incidents
Safe Man-Hours
Certified Management Systems
PPE Compliance
Tell us about your crossing, tunnel, or shoring project — our engineers will scope it and respond within one business day.