Horizontal Directional Drilling
Zuluf AH Crude Oil Increment Project
HDD of a 42″ carbon steel pipeline over 2,917 LM, combined with 580 LM of micro-tunnelled 48″ and 42″ pipelines.
42″
HDD · Pipe
2,917 m
HDD · Length
48″ · 42″
Micro-Tunnelling · Pipe
580 m
Micro-Tunnelling · Length
Scope of Work
- HDD of 42″ diameter carbon steel pipeline — 2,917 LM
- Micro-tunnelling installation of 48″ and 42″ diameter pipelines — 580 LM
Where the work was
- Site
- Zuluf Field, Saudi Arabia
- Total installed
- 3,497 m
The pin marks the field or corridor, not the exact crossing — the precise alignment is commercially sensitive.