Horizontal Directional Drilling

Zuluf AH Crude Oil Increment Project

HDD of a 42″ carbon steel pipeline over 2,917 LM, combined with 580 LM of micro-tunnelled 48″ and 42″ pipelines.

42″

HDD · Pipe

2,917 m

HDD · Length

48″ · 42″

Micro-Tunnelling · Pipe

580 m

Micro-Tunnelling · Length

Scope of Work

  • HDD of 42″ diameter carbon steel pipeline — 2,917 LM
  • Micro-tunnelling installation of 48″ and 42″ diameter pipelines — 580 LM

Where the work was

Site
Zuluf Field, Saudi Arabia
Total installed
3,497 m

The pin marks the field or corridor, not the exact crossing — the precise alignment is commercially sensitive.

Open in maps