Sales Gas Supply Pipeline to Yanbu — Phase 3

HDD and installation of a 36″ diameter steel pipeline over 700 LM.

Project OwnerSaudi Aramco
36″

Pipe

700 m

Length

Scope of Work

  • HDD and installation of 36″ diameter steel pipeline — 700 LM

Where the work was

Site
Yanbu, Saudi Arabia
Project owner
Saudi Aramco
Total installed
700 m