Horizontal Directional Drilling

Fibre Duct Bank Crossing, Dammam

A 380-metre multi-duct fibre crossing installed beneath a commercial district in 18 days.

ClientTelecom Provider
LocationDammam
Ø315 mm

Diameter

380 m

Length

4.8 m

Depth

18 days

Duration

2025

Completed

The Challenge

The route crossed a dense commercial street where surface excavation would have closed shopfront access during trading hours. The client also needed a duct bank sized for future capacity, not just the initial fibre count.

Our Approach

A single bore was profiled to carry a bundled multi-duct arrangement, sized with spare ways for later expansion. Work was staged from compact entry and exit pits set in low-impact positions clear of the shopfronts.

The Outcome

Delivered in 18 days with no trading day lost on the street above, and with spare duct capacity in place for the client's next two expansion phases.

Let's Talk

Ready to Break Ground?

Tell us about your crossing, tunnel, or shoring project — our engineers will scope it and respond within one business day.

Email Usinfo@gambitgulf.comCall Us+966 —